webleads-tracker

At which moment should I readjust the measurement to the air?

    At the time of air measurement, if the amount of O2 does not lie between 20.7% and 21.1%, an adjustment must be carried out, preferably at the start of production. You are strongly advised not to re-pump air between two measurements.

    Back to top